Current activities
(January 2026) Join us for a Public Information Open House on Thursday, Feb. 12 from 5-7 p.m. at Winters Chapel United Methodist Church (5105 Winters Chapel Rd.). Learn more on Page 9 in the Dunwoody Digest.
(November 2025) Started preliminary design and began working on the 30% plans, which will be submitted to GDOT in May 2026. A public meeting is scheduled for February 12, 2026.
(October 2025) Concept Report approved by Georgia Department of Transportation. Dunwoody was awarded $150K in federal funds for design.
(August 2025) Final field survey was completed.
(March 2025) Dunwoody was awarded $600K in federal funds for design.
(June 2023) Dunwoody was awarded $1.5 million in federal funds to construct Phase II of the path.
Project Information
The Winters Chapel Path project arose out of a joint study, “Peachtree Corners – Dunwoody: Winters Chapel Road Area Study,” which was adopted by both cities in April 2015. Phase II of the path extends along the west side of Winters Chapel Road from the end of Phase I at Charmant Place southward to Peeler Road with a section of the path passing through Peachtree Corners. The design is for a 12-foot wide concrete path for two-way bicycle and pedestrian traffic that is separated from the roadway by a landscaped buffer. Decorative pedestrian lights are also proposed.
Phase I from Dunwoody Club Drive to Charmant Place has been completed.